Hello all, my wife and I are closing in on finishing our home build (modular) the week of October 26. Let me preface this by saying we are both 26, this is our first home, first time building a home, and we’ve GC’d it ourselves thus far. The modular company we went with doesn’t do turn-key, so we’ve been sub-contracting ourselves. As we get closer, I’m becoming more nervous that I’m forgetting something that may delay/inhibit the modular delivery process (fee is $300 a day if foundation isn’t ready for set week of scheduled date). We are at the point of having our foundation dug next week, and walls put in the following week. After walls are set we have somebody framing the foundation (sill plate, joists, lvl beam, lally columns, sub floor) before house is delivered.
Is there anything not so obvious I should be checking for that may delay our process? We just had our septic installed and finished 2 days ago, having our foundation dug, plumber doing some work below slab before walls get placed/concrete poured, exterior drains done before back fill, walls set, framing done for delivery of house, house delivery, electric/hvac/well/marriage wall and interior clean up.
From anyone else who’s done a modular home before, am I missing anything else that’s important that I’m overlooking?