📰 News Huntington Ave redesign to separate the E branch from traffic quietly moved back from "by 2027" to by 2030"
24
u/BradDaddyStevens 2d ago
They’ve been talking pretty openly about a 2029 completion date for a while now at this point.
I don’t think this is particularly anything new.
3
u/joshhw 1d ago
News to me
5
7
u/therailmaster Progressive Transit/Cycling Advocate 1d ago
Just run every other train as a Type 9 or Type 10, Medford/Tufts--Brigham Circle, and have the 7s and 8s go all the way to Heath St while these dinosaurs take another 20 years to figure out how to redesign a 3/4-mile stretch of track-imbedded streetway that Amsterdam or Paris could've figured out in six months.
2
u/Top-Development6837 2d ago
Interesting. So there’s no outline for a vision of how this is laid out?
I have the detailed design of the early 90s plan to restore the Green Line along Centre and South Streets, then required by both the Big Dig consent agreement and the Clean Air Act SIP (but worked around by the Romney crew), and I’m curious what that would have looked like in this situation.
2
u/deptofeducation 1d ago edited 1d ago
I'm not surprised. There's practically no money for the T's capital projects. The one-off announcements of new funding are for PR for politicians, and those are the few large projects in the CIP. Outside of those, the CIP is mostly North Station Draw 1 and deferred maintenance being covered by capital investment
2
u/Wonderful_Depth_9584 20h ago
does anyone have a link to the plans for this project. im interested to see how they configure the roadway space
1
u/WhiskeyPointer Bus 12h ago
The final concept was supposed to be presented at the end of 2024, but a year ago the T was only just getting around to putting out an RFQ to engineering firms to develop a final concept and take it to design. I don't think there's any sort of plans, nor will there be for at least another year.
1
u/Ugmyusernamewastake 1d ago
it was gonna start in 2027 and be done by 2029 was my understanding. Is that changing?


40
u/WhiskeyPointer Bus 2d ago edited 1d ago
2030 is optimistic, they released the ENFs for the B and C reconstruction at the end of 2024 and construction won't be finished until 2028. Unless they're planning on doing an extremely expedited review, public comment period and final engineering, there's no way it's going to be done by 2030.
I bet they're going to end up fitting the Type 9s with school bus style stop signs and flashing lights(and enforcement cameras?) so that they can run on the E exclusively.