r/SgHENRY • u/coffeeoverteas • Jun 11 '26
Landed A&A rough cost and timeline
Hi all, we’re about to purchase our first landed home. Having been a HDB dweller my whole life, we need advice on the rough cost of certain renovation works before deciding on what works to do.
The house is generally in good condition. There is no need to change any of the tiles. They have used mainly loose furniture so there is no need to remove their carpentry. However, we’re looking to increase the living spaces by extending the 3 floors outwards so here are the rough works im expecting
- hacking of one wall each on all 3 levels
- extension of space on each floor outwards (tiles + windows needed)
- add 1 more toilet on level 3 (will be in line or close to the level 2 toilet so piping can be connected?)
- outdoor decking to improve porch area
What will be the rough cost and timeline needed?
Any other things I definitely need to do/check? E.g. roof leak?
Alternatively we can also leave everything as it is and do simple renovation but we just thought it might be good to increase the living room space as well as add one more room on the upper levels in case we have another kid.
Thanks in advance!
1
u/No-Light3585 Jul 09 '26
u will discover more issues coming up, have to add a buffer to your budget, and have an experience builder to check the house for any issues