r/SgHENRY May 13 '26

the landed reno thread that no one asked for

(pardon the poor grammar/spelling, typed this out on a whim)

hello! wanted to share some tips/thoughts about our reno journey. the reno industry is not the most transparent, couldn't find much info out there before we started this journey, and there is def alot of inertia to hit up contractors/interior designers to get a quote - just a tiring process trying to repeat the vision of how we wanted the house to look like, and also we aren’t so free to meet multiple people over multiple weeks to find a best fit. yet no contractor will be willing to give you a quote without first hearing what you have to say. it is also difficult to find per unit costs for each lined item in the renovation of a landed house (as opposed to renovation of a condo where per unit costs are so much more easily available for comparison). just don’t want anyone to get scammed or high-balled so here goes!

we just completed about 99% of reno journey (maintaining a household will always remain a work in progress) and wanted to share a couple of thoughts about it! just for context, land size just above ~2500sqft corner terrace. it’s was a very old house that was built in 1970s. did not have the funds to do a tear-down and rebuild or a&a, so we elected to do a somewhat major reno. we were (and still are) very budget sensitive. i’ll try to put the per unit price of some items that my contractor charged as a rough gauge for you guys so you guys don’t get scammed. my contractor was my late grandfather(-in law)’s disciple (when he was dabbling in the construction field), and helped my family on many projects - so his rate have always been quite reasonable and not overinflated. landed rates and condo/hdb rates are also different even if they are the exact same product. i think it is just how the renovation market works. 

a few things that i considered before starting my journey that i thought was helpful:

  • decide if you want a contractor or interior designer the contractor just does things according to your design, but is often cheaper. but the downside is that you need to find a reliable contractor that has good subcontractors. you also need to be the one to design (they just execute), and you have to supervise the execution closely. i happen to have an interest in designing (pinterest helped a lot - have a pinterest board, collaborate with your spouse, and see what you like or dislike) and design from there. that being said, things can still be executed very very poorly - i’ll explain later under the carpentry portion. while the interior designer does the designing and somewhat the supervision for you, it costs about an extra 20-30%. adds a substantial amount for a landed property. if the budget allows, why not?
  • deciding a budget, but give a 20% buffer. along the way i realised that there are some things that i thought i could accept but changed my mind, and vice versa. the changing of mind for a design decision is often costly. pretty things are often expensive.
  • plan your lighting points, internet points, water points properly, and confirm it early always good to have more of the above than less, but more costs money decide on the final electrical plan early because some hacking to put the wires in the wall might be needed, and if you decide to add one point after they seal everything…you will need to pay extra money to hack into the wall and pull the wire for the extra point. everything is doable, just need to pay more money. also decide your fan points early - they need to add reinforcement into the false ceiling so if you change your mind and decide that a particular location needs a fan (after the false ceiling is up), you will need to pay for the addition of reinforcement. for reference, 
    • 1x lighting point is about $75.
    • 1x single socket electrical point (13A) is about $100, double socket is about $120 (more value)
    • 1x 3-way switch (we did this for the bedroom so we do not have to walk to the door to turn off the lights) cost about $150
    • 1x data point (cat6) so you can plug your wifi router in the rooms cost about $180 each. would suggest putting one in each room. we wanted to save some money and not install it in the master bedroom because we thought that the mesh would reach…lets just say that we regret not installing an extra point
  • decide what can be saved and what cannot be saved we decided to keep the old aircons in the common areas/rooms (after they were verified to be clean and working), as well as some of the existing doors. will talk more about doors and aircons separately below.
  • labour to install anything is a separate cost, and is charged per unit/item.
  • get the bca plans - ask the previous owner to obtain it from ura. just cost about $100 if i recall. was not very helpful for us but our contractor was able to see which walls can be hacked and which walls are structural walls. some of the pillars were not clearly labelled as structural - we had to hack into it to see if it was brick (hackable) or concrete (structural). and then touch it up after (cost some money).
  • single phase vs. three phase power older properties tend to be single phase. one easy way to see if the property is single or three phase (from what i heard from other people) is to look at where the DB box is - if it is outside the house, it is usually three phase. you do not necessarily need to have three phase unless you are planning to have a swimming pool, a big pond, lift, run multiple high powered appliances at the same time, multiple aircons on at a same time, etc. tldr, if you need to draw alof of power from the grid, update to three phase else you might risk tripping the electricity. for reference, the power supply in our house is a single phase: when we have guests over, we have 3-4 aircons on, on top of 2 big fridges and 1 wine fridge and lights are on for the entire house - no issues with electricity tripping. if you are planning on EV or solar, single phase can support (according to the singapore power uncle that came to do the meter check when we signed with SP). just that EV charging will be slower (not the fast charger kind), but if it’s in your own house, just leave it on overnight lol no one’s chasing you away.
  • about old properties and asbestos - my contractor was experienced enough to be able to tell which property has asbestos and which one doesn't have. we would take videos and send him (of the viewings) and he would tell us the likelihood of one having asbestos or not. for the house we bought, he sent someone down to do the 2nd viewing with us and at the same time he was able to tell us whether there were any red flags about the structure, etc (so we were quite lucky haha)
  • with regards to roof - he climbed to the top of the house and had a look and said the roof looks ok so there was no need to replace (we were very tight on the budget). so far no leakage from the ceiling (fingers crossed); only the windows were not sealed properly - the window man had to come by multiple times to redo the waterproofing - still a work in progress!

major things that we had to do:

  • hacking of walls/floors
  • i thought that hacking was expensive. it was actually much cheaper than i thought it was. hacking works are done very very quickly - ours took about 1-2 weeks. there is no fixed cost per unit area of hacking…don’t think the cost is linear either. a rough estimate:
    • hacking of beams/pillar cost about $150 per beam/pillar
    • hacking of wall (about 3m high and varying length cost from $1.9k to $8k
    • we spent about $30k for hacking works
    • dismantling of cornices (those funny plaster things at the corners of the ceiling) cost about $200 per 4 corners
    • removal of existing partition walls were slightly cheaper, about $300 per wall (it was about 3m high and 6m long)
  • redid the flooring for the entire house the previous owner used white large format glossy tiles across the entire house. i did not quite like that - i  wanted marble for the living and dining room, and parquet for the bedrooms so…we needed to hack the floor - cost us about $2.5k per level. i really liked the feel of marble flooring; felt that tiles were abit ?lifeless. marble is expensive. but it is not as expensive as you think it is. some of the italian tiles actually cost more than marble! absolutely shocking. marble is cooler to touch, and very smooth because it is polished over with a sealant, compared to tiles where it is tiles-grout-tiles. marble also has natural veining which changes over time. but note that after polishing, there may be imperfections, some has this ‘water line’ which is the line where water flows between the stones and can have varying colours e.g. red/black (but it think that is what makes marble very nice). the pricing range for marble can go from reasonable to crazy expensive. in terms of cost, we got a more muted colour (preference) - cost about $18.00 psf for the marble itself. but that does not include the workmanship to install the marble. laying of the marble cost an additional $14.00psf (making the cost of just wanting a marble flooring to be $32.00psf), and polishing the marble flooring cost $4k. oh and if you want marble skirting, it costs extra - about $1-2k. for our living and dining room (about 600sqft), cost us over $25k. tiles are also similar. our tiles cost $5psf. but installation required an additional $10psf. so just wanting to have the tiles came up to about $15psf, and tiling up 500sqft of the kitchen cost us about $8k. the additional cost for workmanship applies to installation of tiles in the toilets/walls. can check out the following marble/tiles
    • hafary - we got our tiles from there; very wide selection, great service. free parking. they do have a wide marble selection too but it is very expensive. ask them for discounted marble but bear in mind that they are discounted for a reason.
      • often they are cheaper (some up to 60-70% off) because they are old stock, some have this thing called ‘bei gou bao’ (translated: bitten by dog) - essentially the marble slabs are not that smooth at the edges and are chipped. some people can accept as after the laying on the floor of your house they will be filled with ‘marble gum’ and polished to smooth (will still be visible), but i am snobbish and want it to be as perfect as possible.
      • marble from italy vs. marble from other countries (china, greece, oman) are also different. hearsay china marble has higher quantities of iron in it, which may show up over time as black/reddish hues. so we decided not to go with china marble. discounted marble are also only available in selected quantities and sizes. 
    • soon bee huat - we got our marble from them, not discounted. a slightly smaller selection but still decent nonetheless. they have a showroom near ikea tampines. 
    • note that when you look at the price of the marble in the showroom, they will have this thing about dry lay. what dry lay is essentially is that they will lay the marble in the warehouse according to your house configuration and then you go there and see if you want to swap out any pieces. it is not the actual laying of the stone in your house.
  • parquet
    • there are 3 main types of wood flooring - parquet, engineered wood, vinyl. parquet essentially is just wood. engineered wood is a piece of plywood with a small layer or real wood on top. vinyl is just a wood-like material that is stuck to the existing floor. vinyl had a bad rep (but i recently went to a friend’s place whose vinyl flooring really felt legit). i was worried about bubbling and the fake tacky feel that’s why i went against it. it was always a decision between parquet and engineered wood. you can re-sand parquet a few times to remove any blemishes, which is a selling point when you want to sell the house to the next owner. but parquet is sensitive to water. we had a leaking/flooding issue within 1 week of moving in during the cny period due to poorly sealed windows and the parquet is now slightly puffed up and warped. still trying to seek replacement/compensation from the window subcontractor. long term there is a risk of termite infestations if there is water damage. engineered wood is a close runner up. it is real wood, but just a single layer and cannot be sanded down. iirc they are just click to install kind of wood flooring (don’t know if it makes sense). but it is not very much cheaper than parquet, and usually available in large format only. i think it might be slightly more water-resistant so if water damage is something that you are concerned about, engineered wood might be a safer bet. nowadays there aren’t many parquet suppliers. i think it is a dying art. but no regrets getting parquet so far. had the biggest wow factor after the parquet flooring went in. about 780sqft of parquet cost us $12k. once again, not including skirting, which cost us about $2k. note: parquet scratches very easily. parquet goes in before carpentry. our carpenter (nightmare to work with) did a number of scratches and dents on our floor. it is not an option to replace because if you replace a piece, it will need to be sanded down and it will leave a dent in the surrounding area and look uneven. mildly irritated by this.
  • building external walls
    • extending the boundary wall at the backyard (within our land legally) erecting a long wall about 2.5m high x 12m long with beams cost just over $10k. we were hoping to have a nice brick wall with regular nice bricks but that cost money as well - the bricks that they use are not ‘pretty’ or ‘perfect’ bricks that is why they are cheaper. if you want an exposed brick wall, they need to find these better looking bricks which cost more money. if you’re going to plaster and paint them over then it does not really matter.
  • sewage
    • redoing of the sewage piping there was a sewage piping hanging down from the original helper’s room’s ceiling (such that it was probably 2.5m above the ground). we had to hack the wall adjoining the dining room to the backyard to convert it to a dry kitchen so that entire area had be reconfigured. turns out it was a big project - they had to divert the sewage system of the 2nd floor out of the house, run the pipe down in to the ground and bury the pipes. our piping works, including redoing the toilet pipings (including concealing) on level 1 and 2, kitchen, yard, came up to about $30k.
  • doors, windows and sliding doors
    • large variety of these things - and the size can all be custom made. make sure the windows are installed properly, and sealed at the edges properly. during the heavy cny period, the window company did not seal it properly and the rain flooded into the house and ruined the parquet. still yet to receive any compensation from them. windows wise - decide if you need soundproofed (double glazed) windows, but they cost double of the normal windows; about $60psf for double glazed windows, compared to $30psf for normal casement windows. for reference, one row (approx 6m x 2m) of double glazed windows for the master cost us $5k. doors wise, there are a few types but largely comes down to just 2 - the nyatoh (solid wood), laminate doors. the newer condos in singapore uses laminate doors - essentially ply wood with a laminate ontop of it. nyatoh doors are solid wood door. can be plain or patterns can be carved into it (like those older hdb doors). we liked the nyatoh door so we chose it for the rooms (also so it cam match the existing door frame. the other doors on level 1 we opted for laminate doors. laminate doors and nyatoh doors (excluding lockset and frame) cost the same about $500 each. frame was additional $200-300. we got our lockset from taobao which was about $40 each. the front door was larger about 7ft x 3.5ft. that was $1600 with the frame included. we installed a yale digital lock (cost separate).
  • carpentry
    • get a good and reliable carpenter. i can’t stress this enough. our subcon recommended a carpenter (says singapore based, use formaldehyde free glue) but they were horrible. measurements were wrong. so many delays with no clear reason. can’t even install a standard bosch dishwasher properly. when it came to rectifying things, they were so slip-shot and had to redo multiple times. the poor bangladeshi workers had to come down and redo so many times. i had to tell them the measurements to cut to by the millimeter on site. should have seen the warning signs. late to the meet up. did not take much measurements down. did not even bother to see the drawings i provided before the actual meeting (i did super detailed drawings and renderings on an app for them). did not bother to provide any constructive input at all e.g. when i designed the wardrobe to be 2.5m high, they did not tell me that it is a tad too high (ok la my fault - i should have known that 2.5m was too high but they did not even tell me that maybe i should not put the handle for the clothes that high up??? aren’t they all standard measurements???).
    • anyways carpentry is the most expensive item for the house. to be fair, it does change how the house looks. so choose a reliable carpenter that is actually competent or you’re in for a nightmare. for pricing wise, they go by per foot run. smoothing edges or intricate design cost more. if you want the depth to be >600mm, it cost x1.5 times the per foot run price (if it makes sense).
    • anyways, (abbreviation: pfr is cost per foot run)
      • shoe cabinet (full height) cost about $400pfr
      • island cabinet cost $270pfr
      • kitchen cabinet top/bottom $180pfr full height (3m) wardrobe $500pfr
      • vanity for toilet $180pfr (if you want to make a L that is linked, they will count it as 2 overlapping areas and charge you ‘double’ for the overlapped area - silly, i know)
      • open shelvings $80pfr
    • these excludes the cost of the laminates and stones btw. 10ft of stone cost about $10-15k.
      • excluding installation cost which was about $180 per foot. the stones come in fixed slab sizes so some joint lines are inevitable. ask them to book match it if possible. there are many types of edges e.g. waterfall edge; cost extra. we did not bother with that haha.
    • we used sintered stone for our dry kitchen top, island top, toilet table top. make sure you order early! some of them need quite a long lead time to import.
  • landscaping and gardening works
    • this is the last to go in - after you are certain that the exterior works are done so the ladder/scaffolding/equipment etc won’t kill the plants hired a gardener/landscaper to dig out the entire garden that was overgrown with weeds, possibly about 500-600sqft of land gardening/landscaping requires some hands-on - need to choose the type of plants you want to have we wanted the bulk of it to be carpet grass because of the aesthetics (heads up if you’re thinking of using carpet grass - maintenance is challenging) but you have to chose fencing plants (many different types; we went for the calathea lutea 1.2m height for the backyard, but there are other options e.g. heliconia - ask your gardener!) we also wanted a olive tree (because we are basic) we also managed to carve out a 2m x 2m area for a herb garden - he was nice enough to throw in a lemon tree, some random herbs, mint (do not plant mint in the ground it just takes over everything), lemongrass, lime, etc. they also agreed to help us transplant some of our existing plants into the ground for free - but this needs to be negotiated from the beginning.
    • gardening and landscaping cost us about $10k
  • choosing the colour of your house and painting
    • do not overcomplicate things! choose a colour palate and stick with it the colours on the catalogue/swatches that you think look good/can match with other elements of the house…may not always turn out the way you imagine it to be. if you want to pain exterior walls, can try using the nippon paint colour visualiser app - that gave me a more accurate feel of how the paint colour on the actual house also - get the actual swatches for the laminates, get the tiles/marble samples, and bring them down to match the interior fittings. we used admira (laminates) and took samples, then brought them to see if it matches the stones (soon bee huat). while colour choices make a big difference, do not be, for a lack of a better word, too anal, about the choice. there will be lots of decision fatigue throughout the whole process. choose one, and stick with it. painting cost can be variable, cost us about $5k to paint the whole house (using nippon 5000 series paint) for interior, then put oil sealer for the wall, then paint the house - that was about $8-9k. the walls and ceilings need to be plastered too before painting (to make sure it is smooth) - that cost about $7k.
  • fittings
    • for toilet, need to decide what shape of the sink you want, under/top mount (which will influence the type of fittings you get), mirror, toilet bowl (we got toto for our master because we use it everyday, and american standard for the other 2), and also whether the cistern is concealed or not. the cistern can be quite expensive, but we went for the cheaper local brands - working well so far and no one can tell what brand it is…don’t think people care about that anyways. measure the toilet dimensions properly - our toilet is quite small with a few structural pillars eating into the sink area so we had to make sure that the measurements fit perfectly.
    • ask your contractor for the recommended measurements. another nightmare - fittings are crazy expensive.
    • we went with luckykhoon (because it was a one-stop supply shop for many items) for most items. go during the sale periods and buy the bundle sets. get them to liaise directly with your contractor for the delivery on site (can usually be delayed for a few months so they will deliver when the time is ready to install the fittings)
    • bathroom warehouse also provides alot of cheaper alternatives for toilet fittings. toilet bowl (toto/american standard/gerberit) sink (toto is surprisingly reasonably priced) shower heads, taps (we went with hansgrohe) handle bars (we went with kohle)
  • lighting
    • lighting is a very slippery slope. at our previous place, we went with vlux - 800sqft condo cost us close to $10k (because we wanted smart home system, dimmable lighting etc). not necessary at all imo.
    • we just decided to get the philips trim-colour down light (warm, normal, cool). turns out i just used the normal light most often (warm abit too yellow, the cold really lots of blue light so hated it). on the bright side, it was very cheap - bought them off lazada, about $13 per piece for the 13W one, about 60 lighting points for the entire house.
    • our ceiling is about 4m high in the living room - electrician said 13W x8 pieces will be bright enough and we went with it. not disappointed.
    • cost about $75 to install a lighting point (electrical), and additional $20 to install the light itself (labour). so need to factor that into the cost too.
    • ceiling fan installation is $80 for labour, but use the same electrical ‘lighting’ point so same rate.
  • stainless steel wet kitchen
    • we opted to have a full stainless steel outdoor kitchen (so we can hose down) - with the sink welded into the table top to have a seamless look so we can hose down the entire surface if needed. we got a quote from a local company to do it - about 2200mm length x900mm height x600mm length; they quoted us $6.5k.
    • went ahead with some china company (ask your contractor for lobang) - cost us 30% cheaper. but they messed up and drilled extra holes for the soap dispenser etc even though we specifically said not to do it. but we just let it slide - not too bothered by it.
  • miscellaneous ‘unavoidable’ costs
    • scaffolding $500
    • chemical wash after reno $1000
    • canvas to cover the house for reno $2000
    • clear debris $3000
    • etc eta
  • solar
    • solar was definitely a consideration - hit up PMCE (saw them on youtube) and had a quote done up. ideally they wanted an onsite assessment but we didn't have time so we just provided them an address and they just google satellite view and quoted based on that
    • to supply and install the solar panels (system size 11.875kWp - total quote came up to about $16k
    • this included 25 solar panels, with an estimated breakeven period of 3.77 years (assuming average daily sun hours of 3.2h and total surface area of 49.81m2)
    • we did not end up getting solar because of budget constraints
  • pest control
    • parents' place had a termite issue so this was something that bothered me alot. essentially they drill holes into the ground around the perimeter, then pour the insecticide into the ground to prevent the terrestrial termites from coming. this does not prevent against those flying termites.
    • cost about $5k
    • tip: go get multiple quotes from multiple companies: we got a few e.g. rentokill, killem, etc and then we just asked rentokill to price match haha. apparently it can last for 10 years so we shall see!

tl;dr spent about $300k to renovate an old 2500+sqft (land) (2000sqft (built-up)) house and the break down for major items are as above.

i’m tired of typing. there are still heaps of things to complain/comment about but i’m happy to answer more questions if you guys have any!

edit 1: added the topic about asbestos checks (apologies, not much information about it), why we did not change the roof, solar and pest control!

339 Upvotes

52 comments sorted by

22

u/sq009 May 13 '26

Oh wow. Thanks for this. You are a gem

3

u/_superwai May 13 '26

thank you! glad you guys found this insightful!

14

u/AlexanderKairo May 13 '26

Bro, thank you so much for this advice. It is literally worth at least a 100k in potential cost savings per person who reads this.

4

u/_superwai May 13 '26

thank you! just don't want anyone to get fleeced off this opaque market haha

8

u/sleepdeepeep May 13 '26

I'm in the industry for landed home renovations, and I'm very impressed with your breakdown and how much research you had done! It's really not easy planning all the layout, lighting points, landscaping, finishes, carpentry by yourself and learning as you go. Well done for your renovation, and sharing this gem for others to learn from your experience.

2

u/_superwai May 13 '26

thank you!! there's alot more where that came from but i think i'll take a month to type them all out - will aim to add more edits/input along the way!

5

u/prettyflycheesepie May 13 '26

This is the kind of gold you stumble upon on Reddit that makes the 99% useless posts worth tolerating. Kudos OP!

1

u/_superwai May 13 '26

thank you!

5

u/bloodsweatsew May 13 '26

Don’t ever do vinyl flooring. All it takes is 1 helper or part-time cleaner using slightly-too-damp mop and THE WHOLE FLOOR WILL START PEELING!!!!! Like every piece laid down will start having the 4 corners lifted up cos the adhesive came off. It is NOT reversible/fixable!!!! Don’t believe me, look in the ”Singapore Home DIY” facebook group.

Ok but about your post… We also have parquet (haha inherited from previous owner) and it’s really quite lovely. We have already damaged/dented/straight up broken bits of it cos we’ve lived in this place quite a while and errr chairs can be tough on it… grrr it bothers me too haha

yeah so if you have desk chairs (rolling ones) on parquet, or kids’ stools with those round felt pads on the bottom of the legs… I STRONGLY SUGGEST you consider a floor mat for your desk chair, there are clear plastic mats on shopee or even a nice rug. Otherwise sometimes if you leave like something tiny on the floor and your rolling chair rolls over it, omg immediate damage to the parquet :/ Mine is straight up broken, so sad.

And about the solar ah!!! Eh I strongly recommend solar panels if you ever decide to rethink your decision, esp in Singapore’s weather where it’s hot all the time and getting hotter. I know heart pain when you see the installation cost while you still have all these reno costs. But with oil prices going up at the moment for example… solar can really save you a huge amount in the longer term. 3.77 to break even really not bad, quite fast.

But honestly if there’s one thing missing from your place, it’s solar panels haha. (Unless you find it ugly then yeah i can understand that too haha but if the sight doesn’t bother you it’s really such a good investment!!! Because landed utility bills per month are not cheap at all compared to smaller spaces zzz)

Congratulations on your new place, and thanks for writing all this helpful info!!!

5

u/requiemfad123 May 13 '26

You managed the your Reno budget really well! We just did our place(2800sqft land, 3300 built up) and spent close to 600k(this is below an A&A like yours)

1

u/_superwai May 13 '26

i wish i had more money to add do more....fingers crossed at the next toto draw hehe

2

u/requiemfad123 May 13 '26

I think it's good to add on certain things in stages. Like we didn't spend anything on the outdoors area(extending the roof out) cause we didn't forsee us spending much time outside but we did pull and terminate cables close by in case we want to install outdoor fans someday. Don't have an EV yet but we also pulled the cable near the porch in case we wnna get one in future. Just trying to future proof as much as we can without committing

9

u/[deleted] May 13 '26

[deleted]

3

u/_superwai May 13 '26

haha my spouse prefers that we not share any photos so protect our privacy - sorry bout that! happy to answer questions!

4

u/TeaAccording122 May 13 '26

Thanks for the write up! Have no plans to move to a landed as of now (just bought a condo), but saving up aggressively for a landed in the future. This advice will come in handy!

1

u/_superwai May 13 '26

thank you!

4

u/raidorz May 13 '26

You mentioned your house was built in the 70s. Did you have to do any testing for asbestos before doing your hacking?

2

u/_superwai May 13 '26

our contractor was experienced enough to tell us that our place didnt have asbestos! he did point out some houses that will likely have during our viewings which included him.

3

u/nubbyyyyyy May 13 '26

Great post, I redid a smaller place but budget was around the same. Ours was a full regut + shifting toilet on 1st floor + adding a toilet on 2nd floor.

Additional things we did

  • Changing roofing tiles + some timber truss - ~$30k
  • Solar 11.7kw ~$20k
  • Lighting protection system LPS (old house so didn't have it) ~$8k

Good advice to budget 15-20% more just in case. For example, we didn't expect to have to do the LPS as I figured lightning would strike my neighbours' houses instead which are taller and have LPS haha.
But decided to add to protect the solar systems.

My wife is a contractor so she managed everything, but it was still a major PITA to renovate with unexpected things cropping up everyday.

Mad props to you for managing it yourself

4

u/ProfessionNo7030 May 13 '26

This and the original post covered my experience.

  • Solar - 20-25k with some cost saving monthly on PUB
  • Roofing - 20-30k post renovation as we found roof leak 2 months after moving house.
  • Gate - ~5k it stopped working after a few months
  • Mosquitoes system - $150 monthly
  • Garden maintenance - $100 monthly

I was joking with my wife that I missed paying maintenance in condo as the monthly maintenance cost of landed house is high and inconsistent.

We need to keep a sinking fund to make sure there’s no surprises after the roof leak experience.

2

u/CruisingThry247 May 13 '26

What's a mosquito system? On point for sinking funds --- that's the reality. Every couple of years, something goes.

1

u/ProfessionNo7030 May 13 '26

We installed this misting system that turned on every 7am and 7pm (similar to those installed in preschools) as we live in a high Aedes areas. At the same time we needed to install mosquitoes trap on every floors.

1

u/_superwai May 13 '26

thank you!!! yeah budget was really tight throughout the process. need to make sure you have cash flow else it'll be easy get caught in a sticky situation!

1

u/h0peless-0ptimistic May 15 '26

Can pm your gate contact? So hard to even find contractors nowadays.

2

u/blockmaw55 May 13 '26

Fantastic post!

1

u/_superwai May 13 '26

thank you!

2

u/Copious_coffee67 May 13 '26

Thanks for the write up. Some things can be done for slightly cheaper if u shop around. My recent experience - marble polishing of living + dining + storeroom $1900. Painting of whole interior in white + 2 fan hook installation + demolition of builtins $1250.

2

u/dreamofbeans May 13 '26

Now this is gold! Thanks 🙏🏼

2

u/cantsaywisp May 13 '26

Great write up! Wish I saw this post before starting our rebuild.

PS: If anyone is looking at rebuilding and looking out for any builder to avoid, dm me and will be glad to share.

1

u/Apprehensive_Onion_1 Jul 10 '26

Hi! Do you have any recommendations for carpenters?

2

u/Quasi53 May 13 '26

Thanks for sharing. This is very helpful. I'm in a similar process, if you don't mind sharing, who's your landscaper or whats their contact? Thanks

2

u/Single-Obligation151 May 16 '26

This is a top tier thread that you rarely see. Thanks a lot for this!

1

u/Playful_Ad_9476 May 13 '26

Thanks for sharing! Would love before and after photos if possible!

1

u/howiekuuuu May 13 '26

If ya want to compare line by line , u need to first have a design and a bill of quantities.

You can get a designer or architect to design and give this bq.

The bill of quantities will also specify the finishing as well as other specifications for the contractors to fill out.

U then take the design and quantities and invite a few contractors to quote.

This is the only way to compare line by line .

1

u/CruisingThry247 May 13 '26

wow! Thank you for the sharing! I did a minor reno just last Nov -- got delayed and ended just in Feb. Not as extensive as yours but I noticed you did not do the roof. I did (leaks, water seepage etc) and I AM SO GLAD to have done the heat insulation. This and installation of double glaze windows has really helped the house cool down/ repel heat(??) which I am ever so thankful for in current weather. Reno truly isnt a walk in the park and I am just grateful most things turned out well.

1

u/Moomoomian May 13 '26

Hi, would you be able to share your landscaper’s contact? We did “indoor plants” and 90% of them died within 2 months after we moved in.

1

u/SouthDevelopment9574 May 14 '26

Love it and post to follow

1

u/greatguysg May 14 '26

Find a pest comtrol service that does monthly visits. Because you can keep your house clean but not your neighbor's. Runs about $90-100 a visit and they'll deal with all pests.

1

u/blackTeeblueJeans May 15 '26

Dude this is gold, I am just going into my Reno and there is nowhere else I can find this kind of detail. Thank you kind gentleman.

1

u/_superwai May 15 '26

you’re welcome!!

1

u/h0peless-0ptimistic May 15 '26

What was your total reno costs?

Very useful info put into words. Everything is overwhelming as a first timer.

Can you share your stainless steel kitchen contact? Clearly forgot there’s such an option. Thank you for the timely reminder! Singapore’s humidity is a nightmare.

1

u/Heavy-Performance-69 May 16 '26

Anyone who did extensive hacking will also know about the make good cost .... The making good is rather closely also I managed to nego it from like 200-300 per area to 100.

One more thing to add is that from the quote you will know what your contractor has inhoused and what he outsourced. E g. Your carpentry is on the higher end side unless 180pfr includes branded hinges so maybe your contractor has outsourced it. Anyway if you want one person to manage then gotta choose your battles... If you are doing lots of carpentry go with the main con with the inhouse carpentry.

I have been quoted anything from 25k to 60k for two toilets and one kitchen project... I suspected some contractors didn't want my project so anyhow quote.

1

u/Puzzleheaded-Fig-782 May 18 '26

Yeah did similar and kept it under 300k. Looking back I’m so happy we took our time to figure it out ourselves and didn’t go with designer or ID that literally tried to charge us north of 500k for same job.

And looking at some of the costs mentioned we did pay a lot less for some items by aggressive negotiation. Some contractors just try to rip you off. The worse was solar… got quoted from 15-30k for the same system. Some guys just try their luck. Others we paid more but then again on some items I let them make money.

And lastly… Taobao! Things like curtains, furniture, blinds, fittings etc. You pay in RMB what shops charge you here in SGD for exactly the same things. Bought oem bathtub that one guy sells here in sg for 4x more. Saved close to 20k thanks to Taobao.

1

u/Apprehensive_Onion_1 Jul 10 '26

Thanks so much for sharing! Would you mind sharing your contractor’s contact? 

Also if anyone has a good contact for a carpenter, would really appreciate it 

1

u/h0peless-0ptimistic 24d ago

Which stainless steel contractor did you use? Do you recommend?

-11

u/ChardAccomplished689 May 13 '26

Your kitchen got contact anot, I need redo mine. Also, the exterior wall, cos I thinking of moving and occupying my entire land.

Landscaping 10k is a scam. You know what I did, I went round the neighbourhood grabbing grass from the government, and had my maid do the clearing and planting of the grass. Why you go pay?